Notes
Slide Show
Outline
1
West Frederick Construction Continues
  • February 18th, 2009
2
The new tile on the third floor. The green tile is gone.
3
A third floor math classroom
4
A look at the south drive entrance. Air Conditioners will be surrounded to make them quieter.
5
One of two new 6th grade science rooms.
6
A View from the third floor.
7
Third floor teacher’s work room.
8
Would you believe this used to be room 315?
9
A penthouse view from the 3rd floor
10
Sorry for the dirty windows.
11
Staff walking on the second floor
12
The second floor hall on the other side of the cafeteria wall.
13
This will be the computer lab
14
Computer network wiring is in!
15
New air handling equipment on the second floor
16
One of the new second floor classrooms
17
The second floor near the elevator
18
First floor hall outside the administrative suite
19
Our new health suite.
20
The administrative suite hallway
21
The new office conference room
22
Part of the new main office
23
The new front lobby
24
Our special education office
25
The Media Center is not quite ready for books
26
The Media Center workroom looks like a busy place
27
Welcome to the Guidance suite
28
Space for 8th grade lockers out of the hall way
29
This will be an 8th grade science lab
30
A second elevator will be added to the back of the building